‘Design by Contract’ + ‘Componentware’ = ‘Design by Signed Contract’

By: Andreas Rausch

Cite as:

Andreas Rausch, “‘Design by Contract’ + ‘Componentware’ = ‘Design by Signed Contract’”, Journal of Object Technology, Volume 1, no. 3 (August 2002), pp. 19-36, doi:10.5381/jot.2002.1.3.a2.

PDF | HTML | DOI | BiBTeX | Tweet this | Post to CiteULike | Share on LinkedIn

The JOT Journal   |   ISSN 1660-1769   |   DOI 10.5381/jot   |   AITO   |   Open Access   |    Contact